Phase 3 revision
Authored by Phil Treleaven
Science
Professional Development
Used 8+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
51 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of flue arrangement is this?
Open flued natural draught
Open flued forced draught
Room sealed natural draught
Room sealed fan assisted
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What permissions are required for the installation of a solar thermal panel:
Full planning approval must be granted by the local authority.
No planning is required as it is a permitted installation
It can only be installed on a flat roof
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the name of this cycle:
The environmental cycle
The heat pump cycle
The solar cycle
The carbon cycle
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step when undertaking a BS 5440-1 inspection and test?
Flue gas analysis
Spillage test
Flow test
Visual inspection
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the name of this micro renewable system:
Micro combined heat and power system
Ground source heat pump
Biomass boiler
Thermal store
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What system would you find the following heat process:
Condensing gas boiler
Vaporising oil boiler
Air source heat pump
Ground source heat pump
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of ventilation is required in the room that contains a room sealed gas combination boiler?
No vent needed
500mm² per kW input
1000mm² per kW input
2000mm² per kW input
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?