Comms Part 3
Quiz
•
Construction
•
Vocational training
•
Practice Problem
•
Hard
paul martin
FREE Resource
Enhance your content in a minute
17 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Which professional is responsible for assessing building designs to meet the requirements of people with disabilities?
Civil engineer
Interior decorator
Electrician
Building surveyor
2.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Fill in the blank: The building services engineer is responsible for designing systems such as _______ and air conditioning.
heating systems
elevators
fire alarms
plumbing fixtures
3.
MATCH QUESTION
5 mins • 1 pt
Match the following construction project roles to their correct descriptions:
The Estimator
Ensures the health, safety, and welfare of persons working on site and visitors, administers safety inspections, keeps safety records, and instigates accident investigations and training.
The Buyer
Responsible for sourcing and purchasing the necessary materials at the best price and ensuring correct quantities are delivered on time.
The Planning Engineer
Breaks down the bill of quantities into labour, plant, and materials, applies pay rates, and adds percentages for profit, overheads, and administration costs.
Health and Safety Manager
Responsible for pre-contract planning, planning efficient and economical use of plant, material, and labour resources.
4.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Who is responsible for designing the roads, bridges, and tunnels that lead to the construction site, as well as the building’s water requirements?
The Architect
The Civil Engineer
The Electrical Engineer
5.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Who is responsible for ensuring the health, safety, and welfare of those working on-site and visitors, and for administering safety inspections and training?
Health and Safety Manager
Project Architect
Site Engineer
Procurement Officer
6.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Who is responsible for pre-contract planning, including planning an efficient and economical method of using available plant, materials, and labour resources?
The Planning Engineer
The Site Supervisor
The Safety Officer
The Procurement Manager
7.
MULTIPLE CHOICE QUESTION
5 mins • 1 pt
Who is responsible for sourcing and purchasing the necessary materials at the best price and ensuring that the correct quantities are delivered on time?
The Buyer
The Accountant
The Designer
The Technician
Create a free account and access millions of resources
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
16 questions
Level 1 Orientation to trade
Quiz
•
11th Grade
15 questions
Construction Industry Trivia Challenge
Quiz
•
12th Grade - University
20 questions
Bpec Environmental 1
Quiz
•
KG - University
16 questions
Shop Safety (Woodshop)
Quiz
•
6th Grade - University
15 questions
Site Induction and Safety Measures
Quiz
•
University - Professi...
20 questions
UAS Metode Pelaksanaan Konstruksi Jalan
Quiz
•
University
20 questions
307 Central heating systems 1 Quiz
Quiz
•
2nd Grade - University
15 questions
Construction Safety Quiz
Quiz
•
KG - University
Popular Resources on Wayground
25 questions
Multiplication Facts
Quiz
•
5th Grade
15 questions
4:3 Model Multiplication of Decimals by Whole Numbers
Quiz
•
5th Grade
10 questions
The Best Christmas Pageant Ever Chapters 1 & 2
Quiz
•
4th Grade
12 questions
Unit 4 Review Day
Quiz
•
3rd Grade
20 questions
Christmas Trivia
Quiz
•
6th - 8th Grade
18 questions
Kids Christmas Trivia
Quiz
•
KG - 5th Grade
14 questions
Christmas Trivia
Quiz
•
5th Grade
15 questions
Solving Equations with Variables on Both Sides Review
Quiz
•
8th Grade
