Search Header Logo

PBN - RADIO NAVIGATION EASA 2022

Authored by Ngọc Bùi Thị Diệu

Science

University

Used 4+ times

PBN - RADIO NAVIGATION EASA 2022
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

108 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

According to ICAO PBN Manual, the airspace concept has been developed in order to satisfy the following strategic objectives: safety, capacity, efficiency, environment and access. This is to be achieved by enhancements in:

Communications (COM)

Navigation (NAV)

Surveillance (SUR)

Air Traffic Management (ATM)

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

List the factors used to define area navigation (RNAV) or required navigation performance (RNP) system performance requirements:

accuracy, integrity, continuity, complexity

accuracy, continuity

accuracy, integrity

accuracy, integrity, continuity

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

List all components of performance-based navigation (PBN):

Navigation Specification and Navigation Application

Navigational Regulation, Navigation Specification and Navigation Application

Navigational Aid Infrastructure, Navigation Specification and Navigation Application

Navigational Aid Infrastructure and Navigation Specification

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is true about performance-based navigation (PBN)?

It is not sensor specific.

It requires the development of sensor-specific procedures and routes.

It is similar to conventional navigation; both require a ground-based infrastructure.

It is based on navigation specifications which are sensor specific.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A PBN system cannot be based on:

GPS

NDB/DME

DME/DME

IRU

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the approach phases of flight, PBN accommodates:

angular laterally guided operations.

linear laterally guided operations.

both linear and angular laterally guided operations.

no laterally guided operations but only longitudinally guided operations.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In oceanic/remote, en-route, and terminal phases of flight. PBN is limited to:

operations with angular lateral performance requirements and time constraints.

linear and angular laterally guided operations.

operations with linear lateral performance requirements and time constraints.

ILS/MLS/GLS approach and landing operations.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?