
PBN - RADIO NAVIGATION EASA 2022
Authored by Ngọc Bùi Thị Diệu
Science
University
Used 4+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
108 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
According to ICAO PBN Manual, the airspace concept has been developed in order to satisfy the following strategic objectives: safety, capacity, efficiency, environment and access. This is to be achieved by enhancements in:
Communications (COM)
Navigation (NAV)
Surveillance (SUR)
Air Traffic Management (ATM)
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
List the factors used to define area navigation (RNAV) or required navigation performance (RNP) system performance requirements:
accuracy, integrity, continuity, complexity
accuracy, continuity
accuracy, integrity
accuracy, integrity, continuity
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
List all components of performance-based navigation (PBN):
Navigation Specification and Navigation Application
Navigational Regulation, Navigation Specification and Navigation Application
Navigational Aid Infrastructure, Navigation Specification and Navigation Application
Navigational Aid Infrastructure and Navigation Specification
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is true about performance-based navigation (PBN)?
It is not sensor specific.
It requires the development of sensor-specific procedures and routes.
It is similar to conventional navigation; both require a ground-based infrastructure.
It is based on navigation specifications which are sensor specific.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A PBN system cannot be based on:
GPS
NDB/DME
DME/DME
IRU
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In the approach phases of flight, PBN accommodates:
angular laterally guided operations.
linear laterally guided operations.
both linear and angular laterally guided operations.
no laterally guided operations but only longitudinally guided operations.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In oceanic/remote, en-route, and terminal phases of flight. PBN is limited to:
operations with angular lateral performance requirements and time constraints.
linear and angular laterally guided operations.
operations with linear lateral performance requirements and time constraints.
ILS/MLS/GLS approach and landing operations.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?