processppt2plenary

processppt2plenary

11th Grade

16 Qs

quiz-placeholder

Similar activities

Level 1 Orientation to trade

Level 1 Orientation to trade

11th Grade

16 Qs

Intro to GMAW

Intro to GMAW

9th - 12th Grade

12 Qs

PMO Painting and Wallpapering Questions

PMO Painting and Wallpapering Questions

11th Grade

20 Qs

Health Hazards in Construction

Health Hazards in Construction

11th Grade

15 Qs

Ag Shop Safety Test

Ag Shop Safety Test

9th - 12th Grade

20 Qs

Shop Safety (Woodshop)

Shop Safety (Woodshop)

6th Grade - University

16 Qs

Electrical Technology NCCER (11th Edition) Module 5 Review

Electrical Technology NCCER (11th Edition) Module 5 Review

9th - 12th Grade

15 Qs

307 Central heating systems 1 Quiz

307 Central heating systems 1 Quiz

2nd Grade - University

20 Qs

processppt2plenary

processppt2plenary

Assessment

Quiz

Construction

11th Grade

Practice Problem

Medium

Created by

Mr K

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

16 questions

Show all answers

1.

OPEN ENDED QUESTION

3 mins • 1 pt

Explain the correct procedure for changing a hacksaw blade.

Evaluate responses using AI:

OFF

2.

OPEN ENDED QUESTION

3 mins • 1 pt

Why is it important to remove internal burrs after cutting a pipe with tube cutters?

Evaluate responses using AI:

OFF

3.

OPEN ENDED QUESTION

3 mins • 1 pt

State two types of soldered capillary joints.

Evaluate responses using AI:

OFF

4.

OPEN ENDED QUESTION

3 mins • 1 pt

When might it be desirable to use flame-free methods of jointing copper pipes?

Evaluate responses using AI:

OFF

5.

OPEN ENDED QUESTION

3 mins • 1 pt

How can you ensure that the tube has been fully inserted into a push-fit fitting?

Evaluate responses using AI:

OFF

6.

OPEN ENDED QUESTION

3 mins • 1 pt

Find out and list the names of three manufacturers of push-fit fittings for copper tube.

Evaluate responses using AI:

OFF

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When using copper pipework, the X dimension is:

The centre of the fitting to the engaged length

The edge of the fitting to the edge of the pipe

The centre of the fitting to the end of the pipe

The engaged length to the end of the pipe.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?