
Pretest Origo
Authored by Melinda Regita
Professional Development
Professional Development
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
2 mins • 6 pts
Which statement below is INCORRECT about cost sheet creation?
Newly created cost sheet always starts with an "In-Work" status
To populate BOM in cost sheet, user has to click Rollup button. However, T1 user can manually adjust BOM element in Simulation Cost sheet
In order to create a cost sheet, it is mandatory to always select factory code, costsheet framework, and representative size while it is not necessary to select representative article
Users can only create actual cost sheet for the allocated factories that they have access to
2.
MULTIPLE CHOICE QUESTION
2 mins • 6 pts
What is the cost sheet status that can be deleted?
Submitted & Verified by T1
In-work
Submitted & Verified by CC
Invalid
3.
MULTIPLE CHOICE QUESTION
2 mins • 8 pts
For working number with colorway variation created in DBOM, what is the correct approach to create cost sheet considering that different material also leads to different material price as per below BOM?
Create one cost sheet with all articles included in the same cost sheet and select article with highest material price to be representative article
Create cost sheet separately for each article group that share the same material.
Create one cost sheet with all articles included in the same cost sheet and select article with lowest material price to be representative article.
A & B are correct
4.
MULTIPLE CHOICE QUESTION
2 mins • 6 pts
Which statement below is correct about simulation cost sheet?
BOM in simulated cost sheet can be edited and will not flow back to the official DBOM
Simulation cost sheet can be accessed by anyone who has an access to that specific factory codes
The purpose of simulation cost sheet is to allow user to reflect the simulation done by any cost driver changes such as exploring new solutions, potential new material supplier, change of minute rate, etc
A&C are correct
5.
MULTIPLE CHOICE QUESTION
2 mins • 6 pts
Which cost sheet milestone requires validity date input in system?
Pre Cost
P2
FINAL
P1
6.
MULTIPLE CHOICE QUESTION
2 mins • 6 pts
How many validity date are there in the creation portal system?
6
7
8
Validity Dates are defaulted by system but can be manually selected by user.
7.
MULTIPLE CHOICE QUESTION
2 mins • 8 pts
Which statement is true about Validity Dates of Cost Sheet?
"Valid From" and "Valid To" dates has to be assigned in all cost sheet milestones in order to avoid dummy price issue.
"Valid From" and "Valid To" date are defaulted by system for only cost sheet with "Fisnal" milestone according to the first ex-fty and last ex-fty date and user cannot change it.
"Valid From" and "Valid To" dates are required at Final cost sheet milestone only, system will set a default "Valid From" and "Valid To" date but user can also manually choose the required dates of their choices.
"Valid From" and "Valid To" dates are defaulted by system for all cost sheet milestones according to the first ex-fty and last ex-fty date and user cannot change it
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Popular Resources on Wayground
8 questions
2 Step Word Problems
Quiz
•
KG - University
20 questions
Comparing Fractions
Quiz
•
4th Grade
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
10 questions
Latin Bases claus(clois,clos, clud, clus) and ped
Quiz
•
6th - 8th Grade
22 questions
fractions
Quiz
•
3rd Grade
7 questions
The Story of Books
Quiz
•
6th - 8th Grade