Search Header Logo

Pretest Origo

Authored by Melinda Regita

Professional Development

Professional Development

Used 2+ times

Pretest Origo
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 6 pts

Which statement below is INCORRECT about cost sheet creation?

Newly created cost sheet always starts with an "In-Work" status

To populate BOM in cost sheet, user has to click Rollup button. However, T1 user can manually adjust BOM element in Simulation Cost sheet

In order to create a cost sheet, it is mandatory to always select factory code, costsheet framework, and representative size while it is not necessary to select representative article

Users can only create actual cost sheet for the allocated factories that they have access to

2.

MULTIPLE CHOICE QUESTION

2 mins • 6 pts

What is the cost sheet status that can be deleted?

Submitted & Verified by T1

In-work

Submitted & Verified by CC

Invalid

3.

MULTIPLE CHOICE QUESTION

2 mins • 8 pts

Media Image

For working number with colorway variation created in DBOM, what is the correct approach to create cost sheet considering that different material also leads to different material price as per below BOM?

Create one cost sheet with all articles included in the same cost sheet and select article with highest material price to be representative article

Create cost sheet separately for each article group that share the same material.

Create one cost sheet with all articles included in the same cost sheet and select article with lowest material price to be representative article.

A & B are correct

4.

MULTIPLE CHOICE QUESTION

2 mins • 6 pts

Which statement below is correct about simulation cost sheet?

BOM in simulated cost sheet can be edited and will not flow back to the official DBOM

Simulation cost sheet can be accessed by anyone who has an access to that specific factory codes

The purpose of simulation cost sheet is to allow user to reflect the simulation done by any cost driver changes such as exploring new solutions, potential new material supplier, change of minute rate, etc

A&C are correct

5.

MULTIPLE CHOICE QUESTION

2 mins • 6 pts

Which cost sheet milestone requires validity date input in system?

Pre Cost

P2

FINAL

P1

6.

MULTIPLE CHOICE QUESTION

2 mins • 6 pts

How many validity date are there in the creation portal system?

6

7

8

Validity Dates are defaulted by system but can be manually selected by user.

7.

MULTIPLE CHOICE QUESTION

2 mins • 8 pts

Which statement is true about Validity Dates of Cost Sheet?

"Valid From" and "Valid To" dates has to be assigned in all cost sheet milestones in order to avoid dummy price issue.

"Valid From" and "Valid To" date are defaulted by system for only cost sheet with "Fisnal" milestone according to the first ex-fty and last ex-fty date and user cannot change it.

"Valid From" and "Valid To" dates are required at Final cost sheet milestone only, system will set a default "Valid From" and "Valid To" date but user can also manually choose the required dates of their choices.

"Valid From" and "Valid To" dates are defaulted by system for all cost sheet milestones according to the first ex-fty and last ex-fty date and user cannot change it

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development