Search Header Logo

D54 CHECK YOUR LEVEL

Authored by WINCENTRE CLASSES

Professional Development

Professional Development

Used 4+ times

D54 CHECK YOUR LEVEL
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

26 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which RCC member is primarily designed to resist bending moments?

Column
Beam
Footing
Slab

Answer explanation

Beams are subjected to bending moment and shear force; hence designed for bending.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The diameter of rivet hole for a 16 mm rivet as per IS specifications is:

16 mm
17 mm
18 mm
19 mm

Answer explanation

Rivet holes are typically 1.5 to 2 mm larger than nominal diameter; hence 18 mm.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In a one-way slab, the minimum reinforcement using HYSD bars should not be less than:

0.10%
0.12%
0.15%
0.20%

Answer explanation

For HYSD bars, IS 456:2000 recommends minimum 0.12% reinforcement in slab.

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which AutoCAD command is used to remove objects from a drawing?

TRIM
ERASE
DELETE
REMOVE

Answer explanation

The ERASE command deletes selected objects from the AutoCAD drawing.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which instrument is used in plane tabling for measuring elevation difference?

Pantagraph
Hand Level
Tangent Clinometer
Sextant

Answer explanation

Tangent Clinometer is commonly used for elevation measurement during plane tabling.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the typical water-cement ratio for achieving maximum strength in RCC?

0.85
0.6
0.5
0.3

Answer explanation

A water-cement ratio of 0.5 is commonly used for optimum strength in RCC.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which road alignment principle ensures least excavation and embankment?

Shortest path
Straight alignment
Minimum cost
Balance of cut and fill

Answer explanation

Balancing cutting and filling minimizes earthwork cost and effort.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?