CMT 2

CMT 2

University

19 Qs

quiz-placeholder

Similar activities

Engineering Design Experience Quiz

Engineering Design Experience Quiz

8th Grade - University

15 Qs

ĐỀ CƯƠNG ÔN TẬP MÔN CÔNG NGHỆ

ĐỀ CƯƠNG ÔN TẬP MÔN CÔNG NGHỆ

5th Grade - University

16 Qs

Quiz Round For Group 1

Quiz Round For Group 1

University

20 Qs

Quiz 2_Pengolahan Limbah

Quiz 2_Pengolahan Limbah

University

20 Qs

Cuestionario sobre lagunas de estabilización

Cuestionario sobre lagunas de estabilización

University

20 Qs

Hydrogen and Geothermal Energy Coversion

Hydrogen and Geothermal Energy Coversion

University

20 Qs

Semiconductors and Diode Theory

Semiconductors and Diode Theory

University

20 Qs

Simulador SCRUM

Simulador SCRUM

University

20 Qs

CMT 2

CMT 2

Assessment

Quiz

Engineering

University

Practice Problem

Easy

Created by

Mig Tolentino

Used 16+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

19 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Freshly mixed concrete is checked to ensure that the specified slump is being attained consistently.

Slump Test

Compressive Strength Test

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Common quality control test of concrete based on 7 and 28 day curing period.

Slump Test

Compressive Strength Test

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

8 in diameter at the bottom, 4 inches diameter on top, 12 in high.

Slump Test Cone Device

Volumetric Measure/Cylindrical Mold

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6 inches diameter, 12 inches high

Slump Test Cone Device

Volumetric Measure/Cylindrical Mold

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

It's the only slump that can be measured in the test. The measurement is taken between the top of the cone and the top of the concrete after the cone has been removed

True Slump

Zero Slump

Collapsed Slump

Shear Slump

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Is the indication of very low water cement ratio which results in dry mixes

True Slump

Zero Slump

Collapsed Slump

Shear Slump

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

An indication that the water-cement ratio is too high.

True Slump

Zero Slump

Collapsed Slump

Shear Slump

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?