D61 QUIZ OF THE DAY

D61 QUIZ OF THE DAY

Professional Development

30 Qs

quiz-placeholder

Similar activities

Aptitude King

Aptitude King

University - Professional Development

25 Qs

July 23

July 23

Professional Development

25 Qs

Inclusion in the Preschool Setting

Inclusion in the Preschool Setting

Professional Development

25 Qs

Ultimate office trivia quiz

Ultimate office trivia quiz

KG - Professional Development

25 Qs

Appraisal is Here

Appraisal is Here

Professional Development

27 Qs

UTILITIES - ELEC PT. 1

UTILITIES - ELEC PT. 1

Professional Development

25 Qs

101908/EN100E Life Skills Module IV

101908/EN100E Life Skills Module IV

University - Professional Development

25 Qs

BAT Part- I

BAT Part- I

Professional Development

25 Qs

D61 QUIZ OF THE DAY

D61 QUIZ OF THE DAY

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Medium

Created by

WINCENTRE CLASSES

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which part of a deep manhole forms its lower portion and has a minimum height of 1.8m?

Access shaft
Working chamber
Sidewalls
Bottom invert

Answer explanation

The working chamber is the lower portion of a deep manhole, with a height not less than 1.8m.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which structure connects high level branch sewers to low level main sewers?

Manhole
Junction chamber
Drop manhole
Flushing tank

Answer explanation

Drop manholes are used when there's a vertical level difference of more than 0.5m between sewers.

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Catch basins are constructed to:

Store grease and oil
Trap grit and admit rainwater
Measure sewage velocity
Divert storm water

Answer explanation

Catch basins eliminate silt and grit before allowing rainwater into the combined sewer system.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which device diverts excess stormwater to natural streams?

Storm regulator
Flushing tank
Cleanout
Grease trap

Answer explanation

Storm regulators prevent overloading of sewer lines by diverting excess flow to natural water bodies.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which type of sewer is constructed under obstructions like rivers and railways?

Outfall sewer
Inverted siphon
Relief sewer
Storm sewer

Answer explanation

Inverted siphons are used to convey sewage under obstructions where normal gravity flow is not possible.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Assertion (A): Eutrophication leads to increased algal growth. Reason (R): Phosphates and nitrates in sewage enhance lake productivity.

Both A and R are true, and R is the correct explanation of A
Both A and R are true, but R is not the correct explanation of A
A is true, R is false
A is false, R is true

Answer explanation

Excessive nutrients from sewage cause eutrophication, promoting algal blooms.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which chamber facilitates the junction of two or more sewers at angles less than 30°?

Drop chamber
Catch basin
Junction chamber
Manhole

Answer explanation

Junction chambers are provided where horizontal angles between sewers are less than 30°.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development