S.A.D. Prelim Term Quiz 1

S.A.D. Prelim Term Quiz 1

University

20 Qs

quiz-placeholder

Similar activities

SOFTWARE ENGINEERING

SOFTWARE ENGINEERING

University

20 Qs

QUIZ PENGEMBANGAN PERANGKAT LUNAK DAN GIM

QUIZ PENGEMBANGAN PERANGKAT LUNAK DAN GIM

10th Grade - University

15 Qs

Forum Activity Tech quiz

Forum Activity Tech quiz

University

15 Qs

Database 1

Database 1

University

20 Qs

Quiz Produksi Konten Digital

Quiz Produksi Konten Digital

10th Grade - University

20 Qs

Exam Entornos Virtuales de Aprendizaje

Exam Entornos Virtuales de Aprendizaje

University

15 Qs

OSS (QUIZ 7) Input/Output Systems

OSS (QUIZ 7) Input/Output Systems

University

20 Qs

Workshop_quiz_on Sk-learn

Workshop_quiz_on Sk-learn

University

15 Qs

S.A.D. Prelim Term Quiz 1

S.A.D. Prelim Term Quiz 1

Assessment

Quiz

Information Technology (IT)

University

Practice Problem

Medium

Created by

Dr. Celestial-Valderama

Used 22+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the focus of the Planning and Requirement Analysis phase in SDLC?

Writing source code

Analyzing feasibility and defining requirements

Identifying bugs in the system

Designing system architecture

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following SDLC models is characterized by incremental builds with early feedback?

Waterfall

Iterative Model

DevOps

V-Model

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary goal of the Deployment phase?

To develop source code for the project

To release the software for end-user use

To deploy wireframes for the user interface

To finalize the database schema

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A team plans to conduct a feasibility study before development begins. This activity is part of which SDLC phase?

Maintenance and Feasibility Measurement

Planning and Requirement Analysis

Testing

System Design & Architecture

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which SDLC phase is crucial for adding new features and optimizing the software post-deployment?

System Design

Maintenance

Testing

Implementation

6.

MULTIPLE CHOICE QUESTION

20 sec • 2 pts

What is the key deliverable of the Deployment phase?

Requirement Specification Document

User Training Materials

Source Code

Bug Fix Reports

7.

MULTIPLE CHOICE QUESTION

20 sec • 2 pts

What is the main purpose of the Maintenance phase in SDLC?

To address bugs, make updates, and add new features after the software is deployed.

To finalize and optimize the source code before deployment.

To collect feedback and identify new requirements for future iterations.

To create detailed user manuals and documentation for end users.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?