2021 IPC Chapter 3

2021 IPC Chapter 3

Professional Development

22 Qs

quiz-placeholder

Similar activities

Know Building Superstructure (5)

Know Building Superstructure (5)

Professional Development

22 Qs

Condensing Boilers Worksheet

Condensing Boilers Worksheet

Professional Development

19 Qs

heat pump 2

heat pump 2

Professional Development

20 Qs

Kuiz meeting Project

Kuiz meeting Project

Professional Development

23 Qs

2021 IPC Chapter 3

2021 IPC Chapter 3

Assessment

Quiz

Construction

Professional Development

Hard

Created by

John Holley

FREE Resource

22 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For pipe sizes greater than ______________ inches, restraints shall be provided for drainpipes at all changes in direction and at all changes in diameter greater than two pipe sizes.

4

2

6

8

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where sheathing is used to prevent direct contact between copper piping and concrete walls and floors, the sheathing shall be plastic and have a thickness of not less than ________ inch.

0.008 (8mil)

0.002 (2mil)

0.015 (15mil)

0.025 (25mil)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Plumbing products and materials required to comply with a referenced standard shall be listed by a ________ - ________ __________ ____________ as complying with the referenced standards.

third-party certification agency

local plumbing inspector

manufacturer's representative

building owner

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a parallel water distribution system where hot water piping is bundled with cold water piping, hot water piping shall be ______________ in accordance with Section 607.5.

insulated

painted

exposed

buried

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Exterior water supply system piping shall be installed not less than ______ inches below the frost line and not less than ______ inches below grade.

6, 12

4, 8

8, 16

10, 20

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The maximum horizontal spacing to support copper or copper-alloy pipe is ________ feet.

12

6

8

16

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For horizontal pipes, rigid support sway bracing shall be provided at changes in direction greater than 45 degrees for pipe sizes ________ inches and larger.

4

2

6

8

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?