APR - Prof Prac - Session 02 - Quiz 2

APR - Prof Prac - Session 02 - Quiz 2

University

10 Qs

quiz-placeholder

Similar activities

Chapter 2: Recognizing Opportunities and Generating Ideas (L3)

Chapter 2: Recognizing Opportunities and Generating Ideas (L3)

University

11 Qs

Alphabet of Lines & Line Weights

Alphabet of Lines & Line Weights

University

15 Qs

Theory of Architecture - Colors

Theory of Architecture - Colors

7th Grade - Professional Development

15 Qs

Desarrollo sustentable y ciudad II

Desarrollo sustentable y ciudad II

University

12 Qs

Embodied Energy in Construction

Embodied Energy in Construction

University

12 Qs

FBC: Stairs

FBC: Stairs

University

15 Qs

Renaissance,Baroque and the Transitional Period

Renaissance,Baroque and the Transitional Period

University

15 Qs

ACE Diagnostic Exam

ACE Diagnostic Exam

University

10 Qs

APR - Prof Prac - Session 02 - Quiz 2

APR - Prof Prac - Session 02 - Quiz 2

Assessment

Quiz

Architecture

University

Hard

Created by

Andro Madrogaba

Used 6+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT included in Specialized Allied Services under SPP 203?

Acoustic design

Security system design

Construction supervision

Signage and graphic design

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following best describes the role of the Architect in SPP 204?

Project conceptualization

Monitoring and supervision of construction work

Facility management post-occupancy

Developing cost estimates

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The Architect engaged under SPP 204 is directly responsible to:

The contractor

The client/owner

The project manager

The suppliers

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SPP 205 defines Project Management as:

Total process of planning, monitoring, and controlling project resources

Preparing detailed design drawings

Post-construction monitoring only

Evaluating contractor’s bids

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

SPP 206 (CAS) integrates which phases of services?

Feasibility, design, financial management

Urban planning, project management, sustainability

Programming, design, and construction supervision

Pre-design, design, post-design, allied and management services

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT listed as a Specialized Allied Service under Doc 203?

Site Development Planning

Acoustic Design Services

Architectural Interiors

Structural Engineering

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The term “Post-Construction Evaluation” belongs to which document?

Doc 203

Doc 205

Doc 207

Doc 209

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?