ID333 Quiz No. 1

ID333 Quiz No. 1

Professional Development

10 Qs

quiz-placeholder

Similar activities

SPP DOCUMENTS (201 – 209)

SPP DOCUMENTS (201 – 209)

Professional Development

10 Qs

Philippine Churches

Philippine Churches

Professional Development

11 Qs

Development Process

Development Process

Professional Development

10 Qs

Architecture and Interior Design Basics

Architecture and Interior Design Basics

Professional Development

10 Qs

Powering AIOps 2023

Powering AIOps 2023

Professional Development

12 Qs

URBAN DESIGN: THEORIES AND PRACTICES ALE 2022

URBAN DESIGN: THEORIES AND PRACTICES ALE 2022

Professional Development

15 Qs

Avengers

Avengers

KG - Professional Development

10 Qs

Built Environment Life Cycle Quiz

Built Environment Life Cycle Quiz

Professional Development

10 Qs

ID333 Quiz No. 1

ID333 Quiz No. 1

Assessment

Quiz

Architecture

Professional Development

Practice Problem

Easy

Created by

Aaron Rebato

Used 7+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the definition of a 'site' in the context of construction projects?

The architectural design of the building.

The team of workers involved in the construction.

The financial plan for the construction project.

The geographical venue where the construction project takes place.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a construction project exceeds its budget due to unforeseen mistakes, what financial strategy should be implemented to mitigate losses?

Reducing the workforce

Implementing a contingency budget

Increasing the project timeline

Cutting corners on materials

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the three main stages of the traditional procurement process in construction?

Design, construction, and inspection.

Planning, execution, and evaluation.

Bidding, financing, and completion.

Design, bidding/tendering, and building under a contract.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the definition of a project in the context of the construction industry?

A continuous process of maintaining existing structures.

A long-term initiative aimed at improving infrastructure.

A collaborative effort to design architectural plans.

A temporary endeavor undertaken to create a unique product, service, or result.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are two specific challenges mentioned that the construction industry faces?

Environmental concerns and project delays

Labor shortages and increasing material costs

Market competition and design errors

Technological advancements and regulatory changes

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Describe the difference between traditional contracts and design-build arrangements in construction.

Traditional contracts are more flexible than design-build arrangements.

Traditional contracts are only used for residential projects.

Design-build arrangements require multiple contracts for different phases.

Traditional contracts separate design and construction phases, while design-build arrangements integrate both phases under one contract.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which three countries are mentioned as significant contributors to the construction market's growth?

Canada, Australia, and Russia

Germany, Japan, and Brazil

France, Italy, and Spain

China, the U.S., and India

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?