
207 Carry out first fix flooring and roofing
Authored by Martin Smith
Construction
2nd Grade
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the correct name for this type of roof truss?
Fan
W or fink
Attic
King post
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main purpose of providing roof ventilation?
Allow air movement
Reduce sound transmission
Prevent wet rot
Prevent dry rot
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What do the letters PUWER stand for?
Electricity at work regulation
Personal protective of work regulation
Provision and use of work equipment regulations
Reporting of injuries, diseases and dangerous occurrences regulation
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of pitch roof is shown below?
Single
Double
Triple
Quad
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What maximum distance should a restraint strap be fixed?
1.5m
2.0m
2.5m
3.0m
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the safe working temperature recommended by the Health and Safety Executive in a workshop?
13 degrees Celsius
14 degrees Celsius
15 degrees Celsius
16 degrees Celsius
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of roof structure is shown below?
Flat
Pitch
Hipped
Mansard
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?