208 Carry out first fix frames partitions and stairs
Authored by Martin Smith
Construction
2nd Grade
Used 3+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Any joinery work carried out before plasterwork is known as?
Sub structure.
Second Fix.
Finishing’s.
First Fix.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of joint is used between a door lining head and jambs?
Mortice and tenon.
Tusk tenon.
Housing.
Butt.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of nail should be used to fix a door lining to block work?
Round head.
Lost head.
Cut clasp.
Oval.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A tree that keeps its foliage over winter is also known as which one of the following?
Coniferous.
Deciduous.
Hardwood.
Broad leaves.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the most economical method of converting a timber log?
Box heart.
Tangential.
Quarter sawn.
Through and through.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following is a natural defect in timber?
Insect infestation.
Thunder shakes.
Case hardening.
Dry rot.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one of the following is a defect caused by seasoning?
Insect infestation.
Case hardening.
Blue Staining.
Heart shakes.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?