Search Header Logo

208 Carry out first fix frames partitions and stairs

Authored by Martin Smith

Construction

2nd Grade

Used 3+ times

208 Carry out first fix frames partitions and stairs
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Any joinery work carried out before plasterwork is known as?

Sub structure.

Second Fix.

Finishing’s.

First Fix.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of joint is used between a door lining head and jambs?

Mortice and tenon.

Tusk tenon.

Housing.

Butt.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of nail should be used to fix a door lining to block work?

Round head.

Lost head.

Cut clasp.

Oval.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A tree that keeps its foliage over winter is also known as which one of the following?

Coniferous.

Deciduous.

Hardwood.

Broad leaves.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the most economical method of converting a timber log?

Box heart.

Tangential.

Quarter sawn.

Through and through.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is a natural defect in timber?

Insect infestation.

Thunder shakes.

Case hardening.

Dry rot.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is a defect caused by seasoning?

Insect infestation.

Case hardening.

Blue Staining.

Heart shakes.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Microsoft

Continue with Microsoft

or continue with

Facebook

Facebook

Apple

Apple

Others

Others

Already have an account?