1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Any joinery work carried out before plasterwork is known as?

Sub structure.

Second Fix.

Finishing’s.

First Fix.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of joint is used between a door lining head and jambs?

Mortice and tenon.

Tusk tenon.

Housing.

Butt.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of nail should be used to fix a door lining to block work?

Round head.

Lost head.

Cut clasp.

Oval.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A tree that keeps its foliage over winter is also known as which one of the following?

Coniferous.

Deciduous.

Hardwood.

Broad leaves.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the most economical method of converting a timber log?

Box heart.

Tangential.

Quarter sawn.

Through and through.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is a natural defect in timber?

Insect infestation.

Thunder shakes.

Case hardening.

Dry rot.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is a defect caused by seasoning?

Insect infestation.

Case hardening.

Blue Staining.

Heart shakes.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?