1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The modular ratio used in the working stress method partially accounts for the effect of —
Shrinkage of concrete
Elastic shortening
Creep of concrete
Fatigue of steel
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
For M 25 concrete, the permissible bending compressive stress σcbc as per WSM is —
6 N/mm²
8.5 N/mm²
9 N/mm²
11.5 N/mm²
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In prestressed concrete, the force is transmitted to concrete by bond between steel and concrete in —
Post-tensioned system
Pre-tensioned system
Centrally tensioned system
Load-balanced system
4.
FILL IN THE BLANK QUESTION
1 min • 1 pt
A reinforced concrete column has 1 % steel and modular ratio = 10. The ratio of load carried by steel to that carried by concrete (Ps/Pc) is —
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The critical depth of neutral axis for Fe 415 steel under WSM is —
0.40 d
0.289 d
0.253 d
0.33 d
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In WSM, the stress–strain curve of concrete is assumed to be linear up to the permissible stress.
True
False
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The modular ratio (m) decreases as the grade of concrete increases.
True
False
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?