Presentation Objectives

Presentation Objectives

Assessment

Quiz

Construction

University

Medium

Created by

Javan Johnson

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

33 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

Which objective focuses on distinguishing connection types in steel frames?

Sketch structural steel work connections

Explain the nature of a steel frame

Differentiate between a welded and bolted steel frame joint

Compare steel frames with other frames

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which components primarily make up steel frame buildings as described?

Horizontal steel beams and vertical columns welded in a rectangular grid

Timber studs and plywood sheathing

Reinforced concrete slabs and masonry walls

Precast concrete panels connected by cables

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

Based on the image of the partially constructed building, which statement best explains how loads are managed in steel frame construction?

Loads are carried by non-structural cladding while the frame is for aesthetics

Horizontal beams transfer loads to vertical columns which carry them to the foundation

Columns primarily support lateral loads while beams carry vertical loads to the façade

Loads are distributed equally by the roof panels to the ground

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

In bolted steel construction, what primary advantage makes it a preferred approach?

All fabrication must happen on-site, minimizing transport.

Members are fabricated and painted on-site before lifting.

Most fabrication can occur off-site in workshops, so on-site work is mainly lifting and bolting, making the process faster.

It eliminates the need for trucks or trailers to deliver elements.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

Which connection method in steel structures relies on threaded fasteners tightened with nuts to clamp members together, as depicted in the rightmost diagram?

Welding connection

Rivet connection

Bolt connection

Pin connection

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

In the middle diagram, what mechanical element is primarily used to join the overlapping steel plates?

Bolts

Rivets

Weld beads

Pins

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

Which connection method creates a metallurgical bond without mechanical fasteners?

Bolt connection

Rivet connection

Welding connection

Pin connection

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?