FOR MINDEF SITES WHICH TRANSMISSION NETWORK DO WE USE?
TELCO/SINGTEL
FLAVIAN
TELCO/CIRCLES LIFE
TELCO/M1
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
FOR NON-MINDEF SITES WHICH TRANSMISSION NETWORK DO WE USE?
TELCO/SINGTEL
FLAVIAN
TELCO/CIRCLES LIFE
TELCO/M1
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
POWER LOSS CAN BE CAUSED BY WHICH OF THE FOLLOWING FACTORS?
Fibre attenuation, dirty connectors, connector misalignment, loss of splice and sharp bends.
Not enough electricity
Not putting the Fibre Optic Cable Drum at a sweet spot
Just not your day! Tomorrow might be better.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
WHAT DO WE NEED TO ENSURE WHEN WE ARE HANDLING THE FO DRUM?
Ensure Drum is Shiny and clean
Ensure that the HMA plugs is strapped to Fo drum, no entanglement when laying out the cable, avoid sharp bending of cable
Ensure that the Fo cable is coiled up properly, if we are using for ops entanglement is fine.
All of the Above!
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
After the End of Deployment, who do we need to call for a loopback test?
Call 202 SQN for loopback test.
Call 165 Ops room for loopback test
Call 809/819 SQN for loopback test
Call 165 CC for loopback test
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?