CTL OCT

CTL OCT

1st Grade

5 Qs

quiz-placeholder

Similar activities

Civil war-Day 41-PWD-Stairs

Civil war-Day 41-PWD-Stairs

1st - 5th Grade

10 Qs

CTL OCT

CTL OCT

Assessment

Quiz

Engineering

1st Grade

Practice Problem

Medium

Created by

LAFITE CHONG

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

FOR MINDEF SITES WHICH TRANSMISSION NETWORK DO WE USE?

TELCO/SINGTEL

FLAVIAN

TELCO/CIRCLES LIFE

TELCO/M1

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

FOR NON-MINDEF SITES WHICH TRANSMISSION NETWORK DO WE USE?

TELCO/SINGTEL

FLAVIAN

TELCO/CIRCLES LIFE

TELCO/M1

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

POWER LOSS CAN BE CAUSED BY WHICH OF THE FOLLOWING FACTORS?

Fibre attenuation, dirty connectors, connector misalignment, loss of splice and sharp bends.

Not enough electricity

Not putting the Fibre Optic Cable Drum at a sweet spot

Just not your day! Tomorrow might be better.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

WHAT DO WE NEED TO ENSURE WHEN WE ARE HANDLING THE FO DRUM?

Ensure Drum is Shiny and clean

Ensure that the HMA plugs is strapped to Fo drum, no entanglement when laying out the cable, avoid sharp bending of cable

Ensure that the Fo cable is coiled up properly, if we are using for ops entanglement is fine.

All of the Above!

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

After the End of Deployment, who do we need to call for a loopback test?

Call 202 SQN for loopback test.

Call 165 Ops room for loopback test

Call 809/819 SQN for loopback test

Call 165 CC for loopback test