9. Isolator, Jumpers, AT & Neutral Section

9. Isolator, Jumpers, AT & Neutral Section

Professional Development

15 Qs

quiz-placeholder

Similar activities

Chapter 11: Storm Drainage

Chapter 11: Storm Drainage

Professional Development

15 Qs

7. ATD, Overlaps, Turnout and Cross over

7. ATD, Overlaps, Turnout and Cross over

Professional Development

15 Qs

TEST PM SAP

TEST PM SAP

Professional Development

12 Qs

Ajustes y Tolerancias

Ajustes y Tolerancias

Professional Development

12 Qs

STRENGTH OF MATERIAL

STRENGTH OF MATERIAL

Professional Development

20 Qs

GUIA DE ELECTRICIDAD 2

GUIA DE ELECTRICIDAD 2

Professional Development

10 Qs

9. Isolator, Jumpers, AT & Neutral Section

9. Isolator, Jumpers, AT & Neutral Section

Assessment

Quiz

Engineering

Professional Development

Practice Problem

Easy

Created by

CDC - COMPETENCY DEVELOPMENT CENTRE

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Isolator clearance between Phase and Earth is

450-500 mm

490-520 mm

500-550 mm

550-600 mm

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

'H' jumper distance from support is

5.60 m

2.50 m

3.50 m

2.25 m

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Cross-section of a potential equalizing jumper, small jumper, or 'F' jumper is

65 sq.mm

107 sq.mm

50 sq.mm

105 sq.mm

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

230 V single-phase power supply required for

Lighting of the station yard

Operation of substation equipment

Working of color light signals

All the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Identify the jumper shown.

H-Jumper

G-Jumper

PH-Jumper

None of the above.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

100 KVA Auxiliary Transformers are placed at

SSP

Major Yards

TSS

Stations

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

'BDV' of Transformer oil should be

30 KV / minute

40 KV / minute

60 KV / minute

100 KV / minute

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?