summer 24

summer 24

12th Grade

23 Qs

quiz-placeholder

Similar activities

Energy Conservation

Energy Conservation

10th Grade - University

20 Qs

Technology Resources

Technology Resources

9th - 12th Grade

21 Qs

App 1

App 1

12th Grade - University

20 Qs

Ethical Concerns in Robotics Assessment

Ethical Concerns in Robotics Assessment

11th Grade - University

20 Qs

Module 10 Features and Planes

Module 10 Features and Planes

12th Grade - University

20 Qs

Solidworks Basics Quiz for Students

Solidworks Basics Quiz for Students

10th Grade - University

20 Qs

Static & Direct Current Electricity (E1)

Static & Direct Current Electricity (E1)

12th Grade

19 Qs

Quality Week 2025

Quality Week 2025

12th Grade - University

20 Qs

summer 24

summer 24

Assessment

Quiz

Engineering

12th Grade

Practice Problem

Hard

Created by

Rob Davies

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

23 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

Safety is one type of project risk. Which of the following are other types of risk that must be managed when completing an engineering project? Select all that apply.

Budget/cost

Time/scheduling

Availability of resources

Communication

Changing requirements

2.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

Which of the following tasks are commonly performed by professionals in the medical engineering field? Select all that apply.

Upgrading existing medical devices

Calibrating medical equipment

Training staff on equipment usage

Designing hospital layouts

Conducting safety inspections of medical devices

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is meant by inclusive design?

The design of products that are accessible to/usable by as many people as reasonably possible

The design of products tailored to a single target user group

Design focused solely on cost reduction

Design that excludes accessibility considerations to speed development

4.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

Which of the following activities are typically included in the management of an asset throughout its life cycle? Select all that apply.

Planning and design

Procurement and installation

Routine operation and maintenance

Decommissioning or disposal

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Maximum 41.31 mm; Minimum 39.69 mm

Maximum 40.91 mm; Minimum 40.10 mm

Maximum 41.00 mm; Minimum 40.00 mm

Maximum 41.40 mm; Minimum 39.60 mm

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary purpose of a block diagram?

To present a system as a top-down overview so less technical knowledge is needed to understand it

To provide detailed wiring routes and conductor sizes for installation

To show precise physical dimensions and tolerances of components

To specify material properties for each part

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

What is the primary purpose of a hydraulic schematic?

To show how the components in a fluid power circuit are connected so that the function of the circuit can be understood

To give manufacturing tolerances for hydraulic components

To provide a 3D physical layout of the hydraulic system

To list material specifications for hoses and fittings

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?