Search Header Logo

Tutorial 2: Taking Off Processes

Authored by Har Einur Azrin Baharuddin

Construction

University

Used 2+ times

Tutorial 2: Taking Off Processes
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the three main steps in preparing a Bill of Quantities (BQ)?

Drafting, pricing, billing

Taking-off, working-up, billing

Sketching, measurement, billing

Measurement, editing, printing

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Taking-off involves all the following EXCEPT:

Dimensioning

Describing

Pricing the items

Preliminary calculations

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which column in dimension paper is used for ‘timesing’?

Column 1

Column 2

Column 3

Column 4

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to SMM General Rules A.4.1, the order of dimensions should be:

Height, breadth, length

Width, height, length

Length, breadth/width, height/depth

Depth, height, width

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a type of dimension paper?

Traditional

Cut and Shuffle

Slip Sort

Cubic Sort

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The process of adding extra quantities in the timesing column using a dot is known as:

Working-up

Deductions

Dotting-on

Grouping

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The term “deduction” on dimension paper must be:

Underlined

Highlighted

Bracketed

Written in red

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?