Communication Mock Exam 2 Level 2 (2365) Electrical Installation

Authored by David Lowes

Construction

10th Grade

Used 3+ times

Communication Mock Exam 2 Level 2 (2365) Electrical Installation
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

22 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct answer from the four options. If a customer has special learning difficulties which one of the following should you do?

Call your boss

Refer them to another company

Keep information short and relevant

Return later when someone else is there

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct answer from the four options. Which one of the following would be employed by the main contractor?

Subcontractor

Architect

Building control officer

Clerk of works

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct answer from the four options. When installing an appliance, which document would you reference for the installation instructions?

BS 7671:2018

The Electrical At Work Regulations

Manufacturers’ instructions

Works programme

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct answer from the four options. Which of the following documents offers guidance but is not legally enforceable?

Manufacturers’ instructions

Building Regulations

Act of Parliament

Contract of employment

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct answer from the four options. A building control officer (BCO) commonly works for:

the main contractor

the local authority

the architect

the client

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct answer from the four options. The document that is handed to the customer, detailing the work to be done and a price is called:

an invoice

an estimate

statutory cancellation rights

a quotation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Select the correct answer from the four options. The document that an operative submits, detailing the number of hours worked is:

a time sheet

a specification

a delivery note

a quotation

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?