

Underground rough in
Interactive Video
•
Other
•
11th Grade
•
Practice Problem
•
Hard
Christopher Richard
Used 2+ times
FREE Resource
5 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step Josh takes to start the plumbing process?
Pouring concrete
Installing pipes
Digging trenches
Setting up string lines
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why does Josh use a 45-degree elbow in the plumbing layout?
To connect to the main water line
To ensure proper drainage slope
To make the installation easier
To save on material costs
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What type of pipe does Josh recommend using under a concrete slab?
Cellular core PVC
Copper pipes
Schedule 40 solid PVC
Galvanized steel pipes
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What tool does Josh use to cut the PVC pipe?
Hacksaw
Circular saw
Miter saw
Jigsaw
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How does Josh test the plumbing for leaks?
By filling the pipes with air
By using a test T balloon plug and filling with water
By using a pressure gauge
By running water through the pipes
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?