

Installation and Safety Procedures
Interactive Video
•
Life Skills, Design, Architecture
•
7th - 12th Grade
•
Practice Problem
•
Hard
Lucas Foster
FREE Resource
Read more
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step mentioned in the video?
Reading the instructions
Marking the height for the chalupa
Gathering all tools
Turning off the power
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which personal protective equipment is NOT mentioned in the video?
Gloves
Boots
Mask
Helmet
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is it important to wear a mask during the project?
To look professional
To avoid inhaling dust
To protect from electrical shocks
To keep the face clean
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What tool is used to mark the wall for cutting?
Chisel
Pencil
Screwdriver
Level
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done before starting to cut the wall?
Turn off the power
Clean the wall
Measure the wall thickness
Gather all tools
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How deep should the groove be for the conduit?
2 cm
5 cm
3.5 cm
4.5 cm
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is used to secure the conduit in place?
Glue
Screws
Concrete nails
Tape
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?