

Engineering Testing and Failure Analysis
Interactive Video
•
Science, Engineering, Design
•
5th - 8th Grade
•
Practice Problem
•
Easy
Sophia Harris
Used 1+ times
FREE Resource
Read more
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is it important for engineers to identify failure points?
To avoid using any variables
To improve and refine the solution
To make the solution more expensive
To ensure the solution is aesthetically pleasing
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step engineers take when testing a solution?
Make a plan
Jump in randomly
Ignore failure points
Change all variables at once
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In the bowling alley example, what variable was isolated?
The angle of the ball ramp
The speed of the ball
The weight of the ball
The color of the ball
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is one method engineers use to test a solution in its early stages?
Skip testing altogether
Build a full-scale model
Build a small model
Use computer simulations only
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was identified as a failure point in the bridge model test?
The length of the bridge
The material used for the bridge
The amount of mass it could hold
The color of the bridge
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What caused the Tacoma Narrows Bridge to fail?
Flooding
Earthquake
Too much weight
Wind speed and angle
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why is it important to test for multiple failure points?
To reduce the number of tests
To ensure the solution is as safe as possible
To make the project more expensive
To make the solution more complex
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?