Optimization Problems and Equations

Optimization Problems and Equations

Assessment

Interactive Video

Mathematics, Science, Business

10th - 12th Grade

Hard

Created by

Lucas Foster

FREE Resource

The video tutorial explains how to solve a set of equations involving three unknowns: tons of steel (S), hours of labor (H), and a Lagrange multiplier (Lambda). The instructor introduces a substitution method to simplify the equations, leading to the derivation of values for U and Lambda. The tutorial then demonstrates how to calculate the optimal amounts of steel and labor hours within a given budget, concluding with the solution that maximizes revenue.

Read more

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the three unknowns in the problem introduced at the beginning?

Tons of steel, hours of labor, and Lagrange multiplier

Tons of steel, hours of labor, and cost

Tons of steel, hours of labor, and revenue

Tons of steel, hours of labor, and profit

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What substitution is made to simplify the equations?

U is substituted for H-S

U is substituted for S*H

U is substituted for S/H

U is substituted for H/S

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of introducing the variable U?

To solve for Lambda directly

To increase the complexity of the equations

To eliminate Lambda

To simplify the equations by combining S and H

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How are the equations simplified using constants?

By ignoring the constants

By multiplying and dividing by constants

By adding constants to both sides

By subtracting constants from both sides

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What operation is performed to further simplify the equations?

Multiplying by U to the 2/3 power

Dividing by U to the 2/3 power

Multiplying by U to the 1/3 power

Dividing by U to the 1/3 power

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the relationship between H and S after simplification?

H = 300 * S

H = 400 * S

H = 200 * S

H = 100 * S

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the budget constraint equation used in the final solution?

20 * H + 1,000 * S = 20,000

20 * H + 2,000 * S = 20,000

30 * H + 2,000 * S = 20,000

10 * H + 2,000 * S = 20,000

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?