

World's Toughest Fixes: Radiance of the Seas
Interactive Video
•
Science, Business, Engineering
•
7th - 12th Grade
•
Practice Problem
•
Hard
Olivia Brooks
FREE Resource
Read more
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main goal of the project on the Radiance of the Seas?
To install a new navigation system
To install a new power plant
To repaint the ship
To upgrade the ship's interior
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many workers are involved in the project on the Radiance of the Seas?
400
300
200
100
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the size of the engine being installed on the ship?
The size of a truck
The size of a city bus
The size of a small car
The size of a train
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What unexpected issue did the crew face during the installation?
The engine was too large
A pipe leak occurred
A fire broke out
The ship started sinking
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What tool is used to help move the engine into the ship?
Cranes
Hydraulic jacks
Mechanical hoists
Forklifts
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main challenge when fitting the engine into the ship?
The engine is too heavy
The space is too small
The engine is not powerful enough
The ship is unstable
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How long did the engine installation take compared to the initial plan?
It took twice the planned time
It took the planned time
It took three times the planned time
It took half the planned time
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Microsoft
or continue with
%20(1).png)
Apple
Others
Already have an account?