The video tutorial covers the initial stages of Evo's construction, starting with the excavation of a parking lot and the pouring of a rat slab to create a smooth surface for the first parking level. The electrical team, led by supervisor Bob, begins their work by laying out junction boxes for lighting and fire alarms, ensuring precise placement for future fixtures. The process involves using colored spray paint for tracking and a surveyor for layout accuracy. The next phase involves ironworkers laying rebar to reinforce the concrete deck, followed by electricians connecting junction boxes with flexible Smurf tubes to facilitate wiring.

Read more

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the first step in the construction of Evo's highrise?

Laying down rebar

Excavating 10 feet of dirt

Installing junction boxes

Pouring the rat slab

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the rat slab in the construction process?

To provide a smooth surface for parking

To mark the layout for electricians

To support the rebar grid

To reinforce the concrete deck

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When does the electrician's work begin in the construction timeline?

After the rebar is laid

After the rat slab is poured

After the junction boxes are placed

After the Smurf tubes are connected

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the junction boxes installed by electricians?

To support the rebar

To hold fixtures like lights and alarms

To provide a base for the rat slab

To connect the Smurf tubes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How do workers ensure the junction boxes are placed correctly?

By following control lines

By measuring with a ruler

By using a GPS system

By using a laser level

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What material is used to reinforce the concrete deck?

Steel beams

Plastic mesh

Wooden planks

Rebar

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the rebar in the construction process?

To mark the layout for electricians

To reinforce the concrete deck

To provide a smooth surface

To support the junction boxes

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?