The video tutorial explains the process of setting up scaffolding using adjustable Jack screws to achieve precise deck height. It discusses the importance of maintaining tolerance levels and using a builder level for accurate measurements. The tutorial also covers the placement of 4x6 supports and the application of HDO plywood, which is designed for concrete forms due to its smooth and durable surface.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the initial step in the construction process described?

Installing windows

Laying down the concrete

Painting the walls

Adjusting the height with scaffolding

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What tool is used to ensure the height is set precisely?

Builder level

Hammer

Measuring tape

Laser pointer

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the tolerance level mentioned for the measurements?

Between 1/2 and 3/4 inch

Between 1/8 and 1/4 inch

Between 1/4 and 1/2 inch

Between 1/16 and 1/8 inch

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of material is used to top off the structure?

Glass sheets

Plastic panels

HDO plywood

Metal sheets

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the smooth surface of the plywood used?

To reduce weight

To provide insulation

To facilitate concrete forming