The video details the challenges faced during tower construction in snowy conditions. With 7 meters of snow, workers use snow cats and bulldozers to clear paths. Hans Burkard, a renowned crane operator, plays a crucial role in navigating difficult terrains to keep construction on track. At Tower 3, the team faces the challenge of lifting a 5,000 kg saddle, which tests the crane's limits. Through strategic weight adjustments and stabilization, the team successfully completes the task, highlighting the ongoing battle with nature.

Read more

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the initial obstacle faced by the construction team?

A broken crane

Heavy rainfall

7 meters of snow

A landslide

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What method did the team use to create a stable path for the crane?

Building a temporary bridge

Laying down wooden planks

Using a helicopter

Dumping gravel onto plastic sheets

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is Hans Burkard considered a legend in the industry?

He can operate cranes in difficult terrains

He designed the towers

He invented a new type of crane

He has the fastest construction record

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the weight of the saddle that Hans needs to lift?

10,000 kg

7,000 kg

5,000 kg

3,000 kg

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the main risk when Hans attempted to lift the saddle?

The crane could tip over

The saddle could break

The load could swing uncontrollably

The tower could collapse

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many times did Hans attempt to lift the saddle before succeeding?

Once

Twice

Three times

Four times

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What adjustment did Hans make to stabilize the crane?

Extended the crane arm

Changed the crane's position

Reduced the load weight

Added more counterweights

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?