Eustace's Electricity and Pipeline Challenges

Eustace's Electricity and Pipeline Challenges

Assessment

Interactive Video

Science, Geography, Life Skills

7th - 10th Grade

Hard

Created by

Jackson Turner

FREE Resource

In North Carolina's Blue Ridge Mountains, Eustace faces a halt in his lumber build due to a winter freeze blocking the water line to his hydroelectric generator, leaving him without electricity. He investigates the issue, finding the pipeline frozen. With Preston's help, they work to clear the ice blockage. After successfully restoring water flow, power returns, allowing them to resume their lumber work.

Read more

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What problem does Eustace face due to the winter freeze?

His pipeline is too short.

His generator is producing too much electricity.

His lumber operations are halted.

His water supply is overflowing.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Eustace suspect is the issue with the pipeline?

It is leaking.

It is frozen.

It is too old.

It is too narrow.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Eustace's plan to fix the pipeline issue?

Install a new generator.

Break the ice covering the pipe.

Wait for the ice to melt naturally.

Replace the entire pipeline.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who assists Eustace in checking the pipeline?

A local technician.

Preston.

His brother.

His neighbor.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What indicates that the water flow has been restored?

The generator starts making noise.

Eustace hears the water moving past.

The ice starts melting.

The pipeline changes color.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the result of restoring the water flow?

The generator overheats.

The electricity is restored.

The water freezes again.

The pipeline bursts.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Eustace plan to do after restoring electricity?

Take a break.

Work on the lumber.

Move to a warmer location.

Install a new generator.

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How does Eustace feel about getting the electricity running again?

Indifferent.

Frustrated.

Relieved.

Disappointed.