1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What was the primary task for the team on the first day of curtain wall installation?
To paint the panels
To clean the site
To dismantle the existing wall
To hang a dozen panels
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who is the deck foreman overseeing the installation?
Rick Moris
Paul Truax
Brian Oliver
Tim Walswick
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who is the general foreman overseeing Brian Oliver?
Tim Walswick
Rick Moris
Paul Truax
John Doe
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is emphasized as crucial for the new workers on the job?
Speed
Independence
Coordination and supervision
Creativity
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What issue did the team face with the steel T-bar?
It was too short
It was an inch too long
It was missing
It was bent
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What tool did Brian request to solve the T-bar issue?
A saw
A hammer
A drill
A torch
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What problem did the team encounter with the concrete slab?
It was too narrow
It was too thick
It was cracked
It was not perfectly plumb
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?