Gullfaks to Hebron: Building the Hebron Oil Platform

Gullfaks to Hebron: Building the Hebron Oil Platform

Assessment

Interactive Video

Arts, Architecture, Engineering, Other

10th - 12th Grade

Hard

Created by

Quizizz Content

FREE Resource

The video discusses the discovery and development of the Hebron oil field in Canada, highlighting advancements in concrete technology over the past 20 years. It details the construction of the Hebron oil platform, emphasizing safety and execution. The video also covers the building and transport of the topside structure, and the installation process, considering environmental challenges like icebergs and earthquakes.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What year was the Hebron and Ben Nevis oil field discovered?

1970

1980

1990

2000

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary role of admixtures in concrete?

To reduce cost

To increase weight

To adjust hardening speed

To change the color

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many wells does the base of the Hebron oil platform contain?

75

100

25

52

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the weight of the Hebron platform's central topside after adding the accommodation module and derrick?

70,000 tons

65,000 tons

50,000 tons

44,000 tons

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the main challenge in getting the derrick off the barge?

Its length

Its color

Its width

Its high center of gravity

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What equipment was crucial for moving the massive steel structure to the shore?

Trucks

Cranes

Skid shoes

Helicopters

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What environmental factor is a significant design consideration for platforms in Canada?

Tornadoes

Icebergs

Earthquakes

Volcanoes