
B-29 crew internal pre-flight checks, preparation for taking off
Interactive Video
•
Architecture, Engineering
•
KG - University
•
Practice Problem
•
Hard
Wayground Content
FREE Resource
Read more
5 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which crew member is positioned directly ahead of the pilot and copilot?
Navigator
Bombardier
Flight Engineer
Radio Operator
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first step in starting the aircraft engines?
Turn on the Magneto switch
Close all throttles except number one
Start the fuel boost pump
Press the starter switch
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be done after all four engines are running?
Close the bomb bay doors
Engage the secondary clutch
Uncage and set the gyro flight instruments
Check the altimeter
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What must the Bombardier do before takeoff?
Ensure the bomb site is ready
Check the turret warning lights
Disengage the secondary clutch
Engage the directional clutch
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the final step before the aircraft is ready to taxi?
Release the brakes
Remove the wheel chocks
Check the turret warning lights
Signal the ground crew
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?