Hands-On Auto DevOps with GitLab CI - Running Build Steps in Parallel

Hands-On Auto DevOps with GitLab CI - Running Build Steps in Parallel

Assessment

Interactive Video

Information Technology (IT), Architecture

University

Hard

Created by

Quizizz Content

FREE Resource

This video tutorial explains how to run build steps in parallel using GitLab CI. It covers assigning multiple jobs to a single stage, testing applications on different Node.js versions, and handling race conditions by running jobs multiple times in parallel. The tutorial also demonstrates running multiple pipelines in parallel to ensure efficient testing and building processes. The video concludes with a preview of the next topic, which involves using build caches to speed up future builds.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main focus of the video tutorial?

Running build steps sequentially

Running build steps in parallel

Writing unit tests

Deploying applications

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How can you run multiple jobs in a single stage using GitLab CI?

By using the deploy tag

By using a single job name

By assigning them to different stages

By assigning them to the same stage

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why would you want to test your application on different Node.js versions?

To increase the number of jobs

To ensure compatibility with different versions

To reduce build times

To simplify the code

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What feature allows GitLab CI to run a job multiple times in parallel?

The test stage

The build stage

The parallel item

The deploy tag

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the benefit of running a job multiple times in parallel?

To increase build times

To ensure no race conditions exist

To simplify the configuration

To reduce the number of jobs

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does GitLab CI do when a new commit is pushed while the initial pipeline is still running?

It waits for the initial pipeline to finish

It cancels the initial pipeline

It merges the pipelines

It runs the new pipeline in parallel

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must happen for a stage to be considered successful when running multiple jobs in parallel?

Jobs must be in different stages

Jobs must run sequentially

All jobs must finish

At least one job must finish