A Line Is Drawn. Part Two. From a documentary about the NATO Air Defence Ground Environment system (NADGE)

A Line Is Drawn. Part Two. From a documentary about the NATO Air Defence Ground Environment system (NADGE)

Assessment

Interactive Video

Computers, Geography, History

10th - 12th Grade

Hard

Created by

Quizizz Content

FREE Resource

The video discusses the construction of NADGE sites, highlighting the challenges of building roads and infrastructure in remote areas. It emphasizes international collaboration among NATO nations in developing radar and defense systems. The integration and testing of components in California are detailed, showcasing the successful combination of diverse national elements. The video concludes with the evaluation of software by a NATO performance group, ensuring readiness for various scenarios.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary challenge faced by the new road leading to the NADGE site?

Adverse weather conditions

Heavy traffic

Frequent landslides

Lack of maintenance

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which countries were involved in checking the plans for the Greek sister station?

Italy, Spain, Portugal, and Greece

France, America, Britain, and Norway

Sweden, Finland, Iceland, and Ireland

Germany, Belgium, Netherlands, and Denmark

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How were radar components transported to remote locations in Norway?

By truck and ship, with a final helicopter lift

By train and bus

By airplane and drone

By foot and bicycle

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where did the integration of national elements for the NADGE system take place?

New York

London

Fullerton, California

Paris

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the core function of the computers in the NADGE system?

To manage logistics

To control air traffic

To provide weather forecasts

To serve as the heart of an automated air defense system

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who observed the Italian console operators during the software testing?

General Lee Korea

General Smith USA

General Tanaka Japan

General Akar France

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the purpose of rushing the completion of the Italian site?

To host a NATO conference

For all-important flight tests involving combat-ready interceptors

To train new recruits

To conduct a weather study