Glacier National Park - West Tunnel (Accessible Version)

Glacier National Park - West Tunnel (Accessible Version)

Assessment

Interactive Video

Arts, Architecture, Engineering

KG - University

Hard

Created by

Quizizz Content

FREE Resource

The video tutorial explores the historical and engineering aspects of a tunnel constructed in 1926. It highlights the challenges faced during construction, including harsh winter conditions, and the use of dynamite and jackhammers. The tunnel features observation windows offering stunning views, and safety measures are discussed due to reduced visibility and maintenance issues. The installation of a smooth interlining has helped stabilize the tunnel and protect vehicles.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What technology was primarily used in 1926 to construct the West tunnel?

Laser cutting

Hydraulic drills

Dynamite and jackhammers

Electric saws

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why did the workers have to stop construction in October 1926?

Lack of materials

Labor strike

Technical malfunction

Severe winter temperatures

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the main attractions of the tunnel?

Its length

Observation windows with scenic views

The number of lanes

Its historical significance

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What safety advice is given to pedestrians inside the tunnel?

Wear a helmet

Avoid using flashlights

Use extra caution due to reduced light

Walk on the left side

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was installed to prevent damage to vehicles and stabilize the tunnel roof?

Metal beams

Smooth interlining

Concrete pillars

Wooden supports