Vestas Looks at Wind Turbines Made of Wood With Startup Stake

Vestas Looks at Wind Turbines Made of Wood With Startup Stake

Assessment

Interactive Video

Business, Engineering, Physics, Science

University

Hard

Created by

Wayground Content

FREE Resource

The video discusses the reliability of wind turbines in extreme weather, focusing on Texas's recent challenges. It examines the impact of these events on renewable energy progress, emphasizing the importance of winterizing turbines and improving energy storage. The discussion highlights the need for grid management and investment in infrastructure. Additionally, it explores innovations in wind turbine manufacturing, such as using composite wood, to enhance sustainability and reduce carbon footprints.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a major concern for wind turbines in extreme weather conditions?

Lack of skilled labor

High maintenance costs

Reliability and performance

Excessive noise pollution

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What percentage of the world's total energy generation comes from wind?

15%

1%

10%

5%

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How much wind energy was operational in Texas during the peak winter season?

10 Giga Watt

1.8 Giga Watt

7 Giga Watt

4 Giga Watt

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key factor in managing energy during extreme weather conditions?

Increasing fossil fuel usage

Improving grid management

Reducing energy consumption

Building more power plants

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a significant challenge for grids during severe weather?

Lack of renewable energy

Overloading and failure

High operational costs

Insufficient manpower

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What material is being explored for wind turbine towers to enhance sustainability?

Steel

Composite wood

Aluminum

Concrete

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long does it take for a wind turbine to become carbon neutral?

1 year

4 months

1 month

6 months