Process Of Operation Pluto Through English Channel

Process Of Operation Pluto Through English Channel

Assessment

Interactive Video

Physics, Science, Engineering

9th - 10th Grade

Hard

Created by

Quizizz Content

FREE Resource

The video describes the process of welding steel pipes into flexible links, preparing 66 miles of cable wound onto large drums, and the task of laying hollow tubing at the bottom of the English Channel by British merchant ships.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the length of each section of the welded steel pipe?

4000 feet

3000 feet

5000 feet

2000 feet

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long was the cable that was wound onto drums?

50 miles

66 miles

75 miles

100 miles

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the height of the drums onto which the cable was wound?

35 feet

30 feet

25 feet

20 feet

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many British merchant ships were involved in laying the tubing?

50 ships

75 ships

100 ships

150 ships

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the value of the hollow tubing laid at the bottom of the English Channel?

£6 million

£5 million

£4 million

£3 million