Bombs loaded, control room, US army Pacific War, 1945

Bombs loaded, control room, US army Pacific War, 1945

Assessment

Interactive Video

Social Studies, Architecture

KG - University

Hard

Created by

Quizizz Content

FREE Resource

The transcript outlines a military operation involving squadrons carrying GP bombs and flying at a specific altitude and speed. It details the Navy's air sea rescue operations, including the deployment of vessels and aircraft. The mission planning process is described, highlighting the role of a project officer and the use of control room operations to track mission progress and ensure coordination.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the altitude of attack specified for the mission?

10,000 feet

12,000 feet

18,000 feet

15,000 feet

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many submarines are assigned to lifeguard duties?

2 submarines

3 submarines

5 submarines

4 submarines

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the Lieutenant Colonel Captain in the mission?

Project Officer

Radar operator

Lead pilot

Communications coordinator

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is used to indicate the flight lines on the status panel?

LED lights

Digital displays

Yarns

Colored markers

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the status panels in the control room?

To provide a visual progress of the flight

To display weather conditions

To track fuel consumption

To show aircraft maintenance schedules