The video discusses the strategy of removing risk entirely, which is considered the most powerful but least understood approach. It outlines five methods: overdesigning solutions, buying certainty with COTS components, finding alternative solutions, addressing root causes, and removing risky elements. Each method has its own challenges and benefits. The video emphasizes that while these strategies can remove specific risks, they cannot eliminate all risks from a project. The ultimate risk removal strategy is to not undertake the project at all, which ties into risk tolerance.

Read more

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is considered the ultimate strategy for managing risk?

Ignoring the risk

Removing the risk entirely

Transferring risk to another party

Reducing risk to an acceptable level

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does over-designing a solution typically involve?

Minimizing the number of components

Focusing on aesthetics over functionality

Using the cheapest materials available

Over-specifying the robustness of components

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a key benefit of using commercial off-the-shelf (COTS) components?

They are custom-designed for specific needs

They are always the most cost-effective option

They offer a high level of certainty and resilience

They require extensive testing before use

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How can finding an alternative solution help in risk management?

It eliminates the need for stakeholder approval

It may offer a higher degree of certainty

It guarantees the best possible outcome

It always reduces the project cost

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which technique is NOT mentioned as a root cause analysis method?

SWOT analysis

Fishbone analysis

Pre-mortem analysis

Failure Mode and Effect Analysis (FMEA)

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the best way to handle an activity with an unacceptably high threat level?

Delay the activity until risks are lower

Delegate the activity to another team

Remove the activity from the plan

Increase the budget for the activity

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the only way to remove all risks from a project?

Implementing all five risk removal strategies

Not doing the project at all

Hiring a risk management consultant

Using the latest technology