Search Header Logo
Oracle Database Administration from Zero to Hero - Practice - Upgrading Oracle Database

Oracle Database Administration from Zero to Hero - Practice - Upgrading Oracle Database

Assessment

Interactive Video

Information Technology (IT), Architecture

University

Practice Problem

Hard

Created by

Wayground Content

FREE Resource

This video tutorial guides viewers through upgrading an Oracle CDB database from version 19C to 21C. It covers preparation steps, installation of Oracle 21C, and the use of the Auto Upgrade utility. The tutorial also details post-upgrade actions and final steps, emphasizing the importance of manual checks and adjustments. Key tasks include setting up the Oracle environment, running the upgrade utility, and verifying the upgrade's success. The video concludes with recommendations for maintaining the upgraded system and reverting to the previous version if needed.

Read more

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in preparing for the Oracle Database upgrade?

Gather statistics for data dictionary objects

Empty the recycle bin

Verify Oracle user group membership

Download Oracle Database 21C

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to verify that the Oracle user is a member of the Opera group?

To speed up the upgrade process

To ensure proper file permissions

To meet installer requirements

To enable remote login

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During the installation of Oracle Database 21C, what should you do if you receive a warning about the clock source?

Stop the installation

Ignore the warning and proceed

Restart the installation

Change the clock source

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of running the Auto Upgrade utility in analyze mode?

To install additional software

To perform the actual upgrade

To check for potential issues

To create a backup

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which command is used to list running jobs during the upgrade process?

status

tasks

LSJ

jobs

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done before starting the upgrade process to ensure no application users are connected?

Stop the database

Notify users

Backup the database

Stop application users from connecting

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in deploying the upgrade process?

Create a new listener

Run the upgrade in deploy mode

Verify database services

Delete old configuration files

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?