
CLEAN : 162m vertical pier opens in UKs Brighton
Interactive Video
•
Physics, Architecture, Design
•
9th - 10th Grade
•
Practice Problem
•
Hard
Wayground Content
FREE Resource
Read more
5 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is one of the main engineering challenges mentioned in constructing a tall and slender structure?
Creating a strong foundation
Reducing construction costs
Designing double curved double glazed windows
Ensuring energy efficiency
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What historical structure inspired the British Airways I 360?
The Eiffel Tower
The Empire State Building
The West Pier
The London Eye
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What unique experience does the British Airways I 360 offer to the public?
Walking on water
A view from the sea
A ride through the city
A new perspective from the air
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the diameter of the rope used in the I 360's system?
24 millimeters
36 millimeters
48 millimeters
60 millimeters
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary function of the rope and winch system in the I 360?
To control the temperature
To stabilize the structure
To provide lighting
To move the pod up and down
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?