CLEAN : Mauritshuis museum to reopen in June follo

CLEAN : Mauritshuis museum to reopen in June follo

Assessment

Interactive Video

Architecture, Design, Arts

9th - 10th Grade

Hard

Created by

Quizizz Content

FREE Resource

The video discusses the challenges faced with the old CMS system and room setup, leading to the development of a new wing with modern facilities that meet visitor expectations. It highlights the transformation of a historic building into a modern Art Deco structure, emphasizing the architectural design that unites the old and new elements. The future plans include opening gates as a metaphor for the project's vision.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was one of the main issues with the old CMS system?

It was not compatible with modern technology.

It was located in a remote area.

It was too expensive to maintain.

It required warming the room to a specific temperature.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main attraction supported by the new wing?

A state-of-the-art theater

A historical library

The Maredsous

A modern art gallery

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are some of the new features available in the transformed historic building?

A rooftop garden and swimming pool

A good shop, cafe, and educational programs

A cinema and concert hall

A sports complex and gym

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was a significant challenge for the architect in this project?

Finding sustainable materials for construction

Designing a new roof for the building

Integrating two buildings into a cohesive unit

Reducing the overall cost of the project

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the metaphor of opening gates symbolize in the project?

The beginning of a new era for the building

The introduction of new security measures

The end of construction work

The closure of the old facilities