The video discusses the impact of electric power on a bakery in Monrovia, highlighting cost reductions since the reactivation of Liberia's hydroelectric power station. It covers the reopening of the Mount Coffee Hydro Electric Dam and the challenges faced by the Liberia Electricity Corporation (LEC) in reconnecting Monrovia. Efforts to make power more affordable are also discussed, with hopes that improved electricity supply will help alleviate poverty in Liberia.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What significant change did Evil notice in her bakery's production costs after the reactivation of the hydroelectric power station?

An increase in production costs

A 50% increase in production costs

A 70% reduction in production costs

No change in production costs

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What historical event caused the Mount Coffee Hydro Electric Dam to be out of action for over 25 years?

Technological failure

A natural disaster

The country's civil war

Economic recession

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What percentage of Liberians are currently connected to the national grid?

Less than 2%

Exactly 10%

About 50%

More than 75%

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the main issues LEC is trying to address to make power supply more affordable?

Increasing the number of power plants

Expanding wind energy projects

Reducing power theft

Improving solar energy usage

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the expected impact of improved electric supply on Liberia's future?

Increased poverty

More frequent power outages

A brighter future

Higher electricity costs