Thames Barrier closes for annual test before 200th operational closure

Thames Barrier closes for annual test before 200th operational closure

Assessment

Interactive Video

Geography, Science, Physics, Engineering

9th - 12th Grade

Hard

Created by

Quizizz Content

FREE Resource

The Thames Barrier is a crucial flood defense system protecting central London from tidal flooding. It spans 520 meters across the river and has closed 199 times for flood defense, with a total of 613 closures including tests. The barrier consists of 10 gates, with the largest being 61 meters wide and weighing 3300 tons. These gates can be closed in 8 to 12 minutes. The barrier's use is expected to increase over time, with normal operations taking about 1.5 hours. However, in urgent situations, it can be closed in as little as 45 minutes.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of the Thames Barrier?

To protect central London from tidal flooding

To provide a scenic view for tourists

To facilitate river traffic

To generate electricity for London

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many gates does the Thames Barrier have?

5

10

20

15

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the weight of the largest gates in the Thames Barrier?

1500 tons

3300 tons

5000 tons

7500 tons

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long does it typically take to operate the Thames Barrier under normal conditions?

30 minutes

45 minutes

2 hours

1 hour and 20 minutes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the fastest time recorded for closing the Thames Barrier?

60 minutes

30 minutes

45 minutes

15 minutes