Glacier National Park - West Tunnel

Glacier National Park - West Tunnel

Assessment

Interactive Video

Arts, Architecture, Engineering

KG - University

Hard

Created by

Quizizz Content

FREE Resource

The video discusses the construction of a tunnel in 1926, highlighting the challenges faced using the technology of the time, such as dynamite and jackhammers. Work was halted due to harsh winter conditions and resumed in 1927. The tunnel features observation windows and a sidewalk, but caution is advised due to low visibility. Originally unlined, the tunnel was later reinforced to prevent damage from falling rocks and stabilize the structure.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What technology was primarily used in 1926 to bore through the mountain?

Electric saws

Hydraulic drills

Dynamite and jackhammers

Laser cutting

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why did the workers have to stop working on the tunnel in 1926?

Technical difficulties

Lack of materials

Labor strike

Severe winter temperatures

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the features of the tunnel that offers a view of the surrounding area?

Observation windows

Glass ceiling

Panoramic screen

Open-air balcony

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What safety advice is given to pedestrians inside the tunnel?

Wear a helmet

Carry a flashlight

Use extra caution due to reduced visibility

Walk in groups

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was installed in the tunnel to prevent damage to vehicles and stabilize the roof?

Smooth interlining

Concrete pillars

Wooden supports

Metal beams