The video discusses the Troll A platform, a record-setting offshore gas platform. It covers the platform's construction, maneuvering from the dock, towing process, and challenges faced during navigation through the fjord. The installation process is detailed, highlighting the platform's Guinness World Record achievement. The video also touches on the engineering expertise and continuous development in maritime and hydrocarbon projects.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary reason for filling water into the platform during the initial maneuvering?

To prevent uncontrolled liftoff

To test the platform's stability

To increase the speed of the platform

To make the platform heavier

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is a clear chain of command crucial during the towing process?

To reduce the number of vessels needed

To coordinate the force applied by vessels

To ensure the platform moves faster

To minimize the cost of towing

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was a significant challenge faced during the towing of Troll A?

Navigating through a narrow channel

Avoiding uncharted rocks

Managing a large number of vessels

Dealing with strong ocean currents

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What record did the Troll A platform set in 1996?

Longest operational platform

Tallest offshore platform

Largest offshore gas platform

Most expensive platform

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is emphasized as crucial for adapting to new standards in platform design?

Using more advanced materials

Increasing the size of platforms

Continuous improvement and development

Reducing the cost of construction