CLEAN : Tunnel boring machine installed for China-backed Malaysian railway project

CLEAN : Tunnel boring machine installed for China-backed Malaysian railway project

Assessment

Interactive Video

Other

10th Grade - University

Hard

Created by

Quizizz Content

FREE Resource

The video discusses a construction project, detailing the timeline, phases, and progress. It highlights the need to install TPM and construct a 450-meter tunnel before moving the PPL machine. As of December last year, 26.49% of the project was completed, with a target completion date of 31st Example 26. The most critical task is completing a panel within three years.

Read more

2 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the length of the tunnel that needs to be constructed before moving in?

300 meters

450 meters

600 meters

750 meters

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What adjustments need to be made to the PPL machine?

Extract everything

Install new parts

Change the location

Increase the size