Futuristic new bridge unfolds like an umbrella

Futuristic new bridge unfolds like an umbrella

Assessment

Interactive Video

Science, Arts, Architecture, Business, Information Technology (IT), Engineering

11th Grade - University

Hard

Created by

Quizizz Content

FREE Resource

The video tutorial explains the construction of a unique bridge in Austria, built vertically instead of horizontally. Engineers used scaffolding to erect two vertical concrete piers and attached steel girders on both sides. The piers were then lowered using hydraulic systems, allowing the steel girders to unfold and reach a horizontal position. Concrete was added to complete the structure, resulting in the 116-meter Lafnitz Bridge, which was unfolded over the Lafnitz River on February 27th, 2020.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What distinguishes the construction method of the Austrian bridge from traditional methods?

It uses horizontal scaffolding.

It is constructed underwater.

It is built vertically with scaffolding.

It is made entirely of wood.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the hydraulic systems in the bridge construction?

To transport materials.

To slowly lower the piers.

To lift the bridge into place.

To paint the bridge.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens to the steel girders as the piers are lowered?

They are replaced with wooden beams.

They are painted.

They are removed.

They unfold to form a horizontal position.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What additional material is added to complete the bridge structure?

Concrete

Plastic

Wood

Glass

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On what date was the Lafnitz Bridge unfolded over the Lafnitz River?

April 10th, 2020

March 3rd, 2020

February 27th, 2020

January 15th, 2020