ON WITH THE JOB

ON WITH THE JOB

Assessment

Interactive Video

History

KG - University

Hard

Created by

Wayground Content

FREE Resource

The video discusses the Worcestershire Twins project, celebrated by Mr. Edmonds of the London County Council, and the construction of the Hammersmith flyover, a crucial part of improving traffic flow between London and the West. It highlights a building challenge on London's South Bank, showcasing a speedy construction method. The video concludes with a humorous note from the cameraman, emphasizing quick work.

Read more

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What was the purpose of the celebration mentioned in the first section?

Completion of the Hammersmith flyover

Opening of a new shopping mall

Launch of a new train service

Inauguration of a new park

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the significance of the Hammersmith flyover?

It is the longest bridge in London

It is a vital unit for speeding traffic between London and the West

It connects two major airports

It is a pedestrian-only bridge

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What construction method was highlighted on London's South Bank?

Traditional bricklaying

Prefabricated building system

Steel frame construction

Wooden frame construction

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long did the workers claim it would take to complete their building task?

1 day

3 hours

90 minutes

1 week

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What humorous comment did the cameraman make at the end?

He forgot his camera

He brought the wrong key

He lost his script

He missed the bus